The past two weeks (three if you include spring break) have been extremely stressful and busy! I have been finishing up my booklet and getting it organized to be turned in. The only thing that I have not covered is the FF&E Specs because the task is daunting. I have found more of the codes that apply to my building and have added my design development.
The next large task I took on was developing my construction documents. This has consumed most of my time when working at studio. I have organized and laid out every page of the CDs. Each dimensioned plan, furniture plan, and fire & life safety plan is done. I am currently finishing the reflected ceiling plans and then will be moving on to millwork. I also completed the 2 building sections for the technical packet.
When I met with my group, I realized we were all on different schedules. Addie worked on her construction documents over spring break and has those almost complete. She has begun modeling so she can bring her buildling into 3ds Max for rendering later on. Alyssa has been working on millwork and details within her buildling. She mainly focused on the fireplace last week and creating the drawings for that piece. Each of us plan to finish up our project books during this week and crunching away at our technical packets.
No comments:
Post a Comment